Project Portfolio
DOT / Public Works Projects
DOT / Public Works Projects
Pointe Mouillee
Monroe, MI – 2023
$
Prime contract to perform excavations of 120 acres to allow the USACE to place dredged material for 2023.
NASA Altitude Chamber
Sandusky, OH – 2023
$80,000
Subcontract to perform demolition, embankment of building addition pad and fire line.
West Harbor Pier
Vermilion, OH – 2023
$1,235,250
Prime contract to perform the removal and replacement of the west pier wall in the Vermilion Harbor for the USACE.
Washington Township Municipal Complex
Mansfield, OH – 2022
$894,528
Prime contract to perform the early site package that includes excavation to embankment, storm utilities and placement of parking lot aggregates.
Crown Water
Westlake, OH – 2023
$220,000
Subcontractor to perform demolition and excavation.
Lorain County Airport Runway
Elyria, OH – 2022
$930,028
Subcontractor to perform grading, storm utilities and underdrains.
Cedar Point Causeway Wetlands
Sandusky, OH – 2021
$2,978,321.00
Prime contract to build berms out into Lake Erie for future placement of dredged material. This is a pilot project for ODNR & The Army Corp of Engineers resulting in a natural wetlands and habitat.
ODOT SR20 Roundabout
Norwalk, OH – 2021
$1,647,844.00
Prime package including earthwork, underdrains, utilities, lights, landscaping, concrete, asphalt & aggregates.
ODOT SR113 Minor Widening
Milan, OH – 2021
$1,060,000.00
Site package including earthwork, underdrains and aggregates
Ohio Air National Guard
Mansfield Lahm Base, OH – 2021
$332,000.00
B403 Corrosion Bldg Renovation
Site package including earthwork and utilities
Wabash Cannonball Sewer & Pump Station
New Sanitary Sewer Whitehouse, OH – 2021
$2,486,000.00
Complete Prime package including sanitary sewer, storm sewer, jack & bore & rehabilitation of existing pump station
Bluffton Airport
Rehabilitate Taxiway C Bluffton, OH – 2021
$1,028,104.00
Complete Prime package including earthwork, storm, underdrains, stabilization & asphalt
Ohio Air National Guard
Mansfield Lahm Base, OH – 2020
$1,725,000.00
New Fire Station
Complete Site package including earthwork and utilities, concrete & asphalt
Ohio Air National Guard
Mansfield Lahm Base, OH – 2020
$471,000.00
Hangar 102 Renovation
Site package including earthwork and utilities
Village of Shiloh
Shiloh, OH – 2020
$734,700.00
Shiloh Waste Water Treatment Plant
On-site & off-site gravity & forced main sewer, pump stations, equalization basin & plant upgrades
Williams County Airport
Bryan, OH – 2020
$2,379,492.00
Williams County Airport
Prime Contract for new taxi-way
Erie-Ottawa International Airport
Port Clinton, OH – 2019
$2,717,456.79
Erie-Ottawa International Airport
Prime Contract for addition of taxi-way and apron expansion
Ohio Department of Natural Resources
Ashley, OH – 2019
$1,500,000.00
ODNR Shooting Range
Mass earthwork for embankment of backstops, parking lots, pavilion for new ranges
City of Lorain
Lorain, OH – 2019
$4,334,000.00
Lorain Black River Reclamation
Prime contract for soil cover & grading of the US Steel property adjacent to the Black River
Mansfield Lahm Airport
Mansfield, OH – 2019
$4,165,000.00
Reconstruct Taxiway “E” and rehabilitate Taxiway “D”
ODNR Dams Decommissioning
Jockey Hollow Wildlife Area, Cadiz, OH – 2017
$1,062,000.00
Decommissioning of Dams No.1 and No.2
ODOT US62 Storm Replacement
Grove City, OH- 2017
$1,997,000.00
Replacement of 2 miles of storm pipe, asphalt replacement & traffic control
Cuyahoga Airport
Cleveland, OH – 2016
$7,800,000.00
Mass Grading (400,000 CY) & storm pipe installation for safety regulation
Bucyrus Water Treatment Plant
Bucyrus, OH – 2016
$1,125,000.00
New water treatment plant involved “open cut” of 14 tank pad floors, including a 43’ deep wastewater tank using 2:1 slopes
ODOT State Route 585
Wooster, OH – 2015
$3,480,000.00
New Construction
Mass Grading, storm pipe, cement stabilization, asphalt & erosion control
Erie Regional Airport Authority
Erie, PA
$12,000,000.00
Runway 6-24 Improvements – Powell Avenue Relocation & Wetland Re-Creation
City of Green
Green, OH
$3,600,000.00
(CAK) Akron/Canton Airport – Business Park Phase III (5400’ Roadway & Utilities)
Ohio Department of Transportation
Troy, OH
$1,984,000.00
SR 41 Road Improvements – Intersection Realignment & Utility Extension
Ohio Department of Transportation
Willard, OH
$1,850,000.00
SR 224 Road Improvements – Widening Project
Medina County Engineer
Medina Co. OH
$2,800,000.00
Erhart/Egypt/Coon Club/Carsten Watermain (24” DIP Cross County Trunk Main)
City of Toledo
Toledo, OH
$1,350,000.00
Tifft Ditch, Phase 2A – 72” RCP Storm Drainage Trunk Sewer
City of Findlay
Findlay, OH
$5,050,000.00
Southwest Interceptor (Large Dia Gravity) & Cross Town Force Main Sewer Projects
City of Toledo
Toledo, OH
$3,030,000.00
Upton Avenue Waterline/Roadway Replacement
Village of Sparta
Sparta, OH
$1,375,000.00
Complete Gravity Sanitary Collection System and Package WWTP Installation
Management Team Qualifications
Management Associates
Combined Years In The Industry
Bachelors Degrees
Associates Degrees
Industry Certifications
Mark Schaffer Excavating & Trucking's combined experience means you can rest assured you have the best company for the job.
Licensing & Training
MSE is an approved MSHA Part 46 independent contractor (surface metal/nonmetal mining.)
MSE is a licensed MSHA Part 48B independent contractor (surface coal mining.)
MSE maintains and performs all new miner and annual refresher training in-house.
MSE has In-house Certified SWPPP inspectors.
MSE employees Ohio State Fire Marshall Certified Fire Main Installers.
MSE has a City of Columbus Certified Sewer & Water Tapper’s license.
MSE is an ODOT Certified Contractor.
Mailing Address
1623 Old State Road N
Norwalk, Ohio 44857
(419) 668-5990